Stripping out, demolitions and structural reconfiguration within an operating Shopping Centre to sub divide existing redundant large retail spaces to create new retail units.
- Project value: £500k
- Project programme: 10 weeks
Project Overview
- Strip out of an existing tenant vacated three storey retail unit
- Demolition of lift shaft and staircases
- Structural infills to redundant lift shaft opening and stair voids
- Segregation of existing unit in to three smaller units, including dividing partitions, new fire strategy and introduction of new mains services to serve the new individual units
- Works carried out with a mixture of day and night shifts to suit the operating requirements of the centre regarding noise and access
- Works carried out in a live shopping centre environment behind branded customer facing hoardings