Boots Gatwick Airport South Terminal Departure Lounge

Fit out of the landlords shell, including the installation of new M&E services.

Working in the live environment of the South Terminal Airside location with all its logistical challenges

  • Project value:   £450k
  • Project programme:  4 weeks

Project Info

Project Overview
  • Fit out the unit to Boots prestige airport specification ,including ceramic floors, MF ceilings and glass portals
  • Installed Thorlux ‘SoLow Smart’ and ‘Kanby TS Smart’ LED lighting system across the whole store. These are intelligent light control systems which use daylight in combination with sensors to maintain light levels and adjust accordingly, saving on average 37.33% energy per year
  • Works carried out at night and behind hoardings to  reduce potential disruption to the airports operations
  • Fit out programme fulfilled within reduced programme from planned 6 weeks to 4 weeks due to developer issues